Perway

Permanent way (Perway)

  • Construction and developments of perway infrastructure
  • General Track maintenance
  • Formation design and rehabilitation
  • Installation of component
  • Project management
  • Design and construction of surface and sub-surface drainage systems
  • Slope stabilization, gabions, loffelstein blocks and other environmental friendly slope stabilization

 

We discharge our experience in the following fields:

  • Perway (Track) Engineering
  • Rail Asset (Tracks) development
  • Construction and maintenance
  • Complete lifecycle management

 

Rail asset development shall include the following activities:

  •  General Track Maintenance
  • Sleeper replacement
  • Turn-out and Universal sleeper replacement and maintenance
  • Ballast replacement and screening
  • Tig and exothermic welding
  • Thermal stress management (Measurement and de-stressing)
  • Formation and drainage rehabilitation
  • Ballast regulation by hand
  • Drainage rehabillitation 

Experience & Knowledge

Knowledge and experience on rail engineering (Permanent way, Signalling and Overhead Track Equipments), township development, road engineering and structural construction

 

Design & Construction

roads, stormwater & drainage systems, pavement, water & sewer reticulation, layerworks, slabs & column, multi-storey office blocks, bridge construction & rehabilitation

 

 

Stay Connected

Go to top